The Ras Al Khaimah casino forms part of Wynn Al Marjan Island on Al Marjan Island, but it was still closed to the public on 10 August 2026. Wynn's newest official guidance gives September 2027 as the month when guests are due to arrive at the resort.
The summary below separates finished work from future plans and dates each time-sensitive detail. Specifications and the opening schedule may change before launch, so every row is tied to the latest official reference available.
| Subject | Verified position | Source date |
|---|---|---|
| Resort position | Construction continues and visits are not yet available | Recorded on 10 August 2026 |
| Planned opening | Set for September 2027 | Wynn results dated 4 August 2026 |
| Licence | GCGRA lists Island 3 AMI FZ-LLC under the Wynn Al Marjan name | Latest GCGRA register |
| Hotel tower | The plan calls for 70 floors and a final height of 352 metres above sea level | Current resort website |
| Guest inventory | All 1,530 units are structurally complete | Update dated 2 February 2026 |
| Gaming space | 225,000 sq ft, equivalent to about 20,900 sqm | Wynn 2025 annual filing from March 2026 |
A construction label does not make rooms, restaurants or the gaming floor available to book or enter. Wynn does offer an email update form, but signing up is neither a stay reservation nor an admission ticket.
Wynn Al Marjan Island will be Wynn's first integrated resort in the Middle East and North Africa, and its developers call it the UAE's first. The plan combines a hotel, licensed gaming facility, dining, entertainment, retail, spa, beach, marina and events centre at one destination.
The development covers more than 60 hectares on Al Marjan Island in Ras Al Khaimah, facing the Arabian Gulf. It is a joint venture involving entities linked to Wynn Resorts, Marjan and RAK Hospitality Holding, while Island 3 AMI FZ-LLC is the name shown in the gaming licence register.
Thinking of the project as an integrated resort separates its announced amenities from its gaming details. Published material so far concentrates on accommodation, restaurants, the beach, events and entertainment, while Wynn has yet to release the detailed game mix.
Wynn's second quarter results on 4 August 2026 say that guests will be welcomed when the resort opens in September 2027. That is the most specific month published so far, replacing pages that mention only 2027, the first quarter of 2027 or spring 2027.
Earlier investor updates aimed for the first quarter of 2027, then Wynn said in May 2026 that a modest delay would be quantified later. The August release supplied that detail and set the current guidance at September 2027.
A company results release is stronger evidence than a property listing or travel blog, yet it remains a forward-looking date for a resort still undergoing fit-out. Check the official resort website and Wynn investor releases before paying for a non-refundable journey.
Each announcement appears in order so an outdated target is not read as the current one. The sequence follows the Ras Al Khaimah casino from an initial proposal to a licensed facility under construction with a stated opening month.
| Event date | Milestone | Meaning |
|---|---|---|
| On 25 January 2022 | The joint Al Marjan Island project was announced | The concept began with an early scope and timetable |
| On 4 October 2024 | Wynn announced the commercial gaming facility operator licence | The project became the UAE's first licensed commercial gaming facility |
| On 25 November 2025 | A site ceremony marked the top of the 70-floor hotel tower | The main tower passed a visible building milestone |
| In December 2025 | Later Wynn updates recorded completion of the structural concrete | Work advanced into the crown, facade and interior stages |
| On 2 February 2026 | The facade reached 83%, accommodation units were structurally complete and Wynn Bridge reached 48% | This is still the latest detailed release of construction percentages |
| On 11 March 2026 | Building work resumed after a short pause | The notice reported status, not an opening or cancellation |
| On 29 June 2026 | Wynn announced an original Punchdrunk theatre production | The planned opening programme gained a named headline show |
| On 15 July 2026 | Wynn's investor presentation showed substantial interior work under way | The latest visual update placed the project in fit-out |
| On 4 August 2026 | Wynn named September 2027 as the month when the doors will open | Use this as the current official date for planning |
A Wynn project story dates the 70-floor ceremony to 25 November 2025, while later corporate updates put the structural concrete milestone in December 2025. November therefore marks the site ceremony and December records the later construction update, rather than treating both references as one event.
In its 2 February 2026 release, Wynn said structural concrete had reached the roof of level 71 and that 21,852 of 26,471 facade panels were installed, or 83%. The guest site calls the building a 70-floor tower, while the work update refers to the level 71 roof. Both descriptions are kept here without deriving another floor count, and the published final target remains 352 metres above sea level after the spire is fitted.
Elevators and escalators were being installed, while mechanical, electrical and finishing teams were working through the guest inventory. Concrete and structural steel work on the low-rise buildings had reached 99%, but that percentage does not mean those areas are ready for guests.
The new 548-metre Wynn Bridge is planned to connect the resort via Wynn Boulevard with E311 and E611. On 2 February 2026 it was 48% complete, with piling finished and nine of the ten bridge column pile caps in place. Wynn was then aiming to finish it in late 2026.
Wynn's August results said construction was moving quickly, and the second quarter presentation showed substantial interior work as of 15 July 2026. Neither source gave a newer facade or bridge percentage, so the February figures remain attached to their date instead of being extended by assumption.
Wynn's 2025 annual report, filed in March 2026, records a gaming area of 225,000 sq ft. The equivalent is about 20,900 sqm, and this is the figure used because it comes from the newest direct corporate filing.
Older property and news reports often quote an approximate gaming floor of 18,500 sqm, including results that are still easy to find. Wynn has not explained whether the two measurements describe separate spaces, so 18,500 sqm remains an earlier estimate and is not combined with the newer figure.
| Measurement | Working figure | Interpretation |
|---|---|---|
| Gaming space | 225,000 sq ft, or about 20,900 sqm | The newest figure in Wynn's annual filing |
| Older figure repeated online | Approximately 18,500 sqm | An earlier estimate rather than the lead figure |
| Project footprint | More than 60 hectares | The entire integrated resort, not just gaming |
| Hotel tower | A 70-floor tower | The current description for guests |
| February structural measurement | 299 metres through the level 71 roof | A dated construction figure, not the final height |
| Height planned with the spire | 352 metres above sea level | The final target stated on the resort website |
Area alone cannot show how many tables or slots there will be, which games will be offered, or how space will be divided between public and private rooms. Wynn had not released those details by 10 August 2026, so a precise inventory needs a newer operator source.
Wynn's February construction update said all 1,530 accommodation units had reached structural completion, although interior fit-out continued. The breakdown keeps apartments, townhomes and estates within the total so the same unit is not counted twice.
| Accommodation type | Units | Description published |
|---|---|---|
| Resort rooms | 1,217 units | Rooms and suites located in the main Resort Tower |
| Enclave suites | 297 units | An upper-floor hotel within the hotel |
| Royal Apartments | 2 apartments | The two apartments at the tower's top |
| Garden Townhomes | 4 homes | Separate garden homes included in the resort plan |
| Marina Estates | 10 residences | Residences positioned beside the marina |
| Grand total | 1,530 units | The currently announced guest inventory |
Enclave is Wynn's hotel-within-a-hotel arrangement on the upper floors, with a dedicated entrance, arrival area and lifts. It centres on suite accommodation and separate service, but Wynn has not announced rates, packages or the date when reservations will open.
Older Wynn releases used the figure 1,542, and competitors continue to repeat it. The February 2026 construction release and current resort materials give a full category breakdown totalling 1,530, which is the total used in this guide.
The resort website lists 22 restaurants, bars and lounges, together with a daytime beach club, for hotel guests and other visitors. Wynn has identified a French-American steakhouse by Alain Ducasse and a second Delilah supper club, but restaurant reservations were still closed at the time of this update.
On 29 June 2026, Wynn announced an original Punchdrunk production for the resort's opening. The published concept gives guests a choice between a conventional seated show upstairs and a moving immersive experience downstairs and backstage, while performance dates and prices remain unpublished.
The plans include a naturally lit parterre for luxury shops, but Wynn has not released the complete store list. Art will appear in public areas and guest rooms, including Jeff Koons' 11-metre Tulips and historic and contemporary works by regional and international artists.
The design includes 420 metres of private white-sand beach and a deep-water marina intended for large yachts. A daytime beach club is also planned, although Wynn has not published day-pass prices or access rules for non-guests.
Wynn lists 12 pools with cabanas and landscaped spaces, as well as a five-star spa, salon and fitness centre. Treatment prices, operating hours and pool entry conditions are not available yet, so they cannot be included in a dependable visit budget.
The official amenities list names a kids' club and outdoor recreation, so the resort's non-gaming areas are intended to welcome families too. Wynn has not released permitted ages, fees or supervision arrangements, and families should wait for the guest policy before arranging childcare.
Coral Court is planned as the resort's centre for celebrations and events, with a published area of 7,708 sqm. Its layout includes six meeting rooms that can be reconfigured, separate salons for brides and grooms, and private prayer rooms for men and women.
The Grand Ballroom measures 2,633 sqm, has a column-free interior and faces the marina. The area lets organisers compare venues, but it does not give a seating capacity because tables, stages, aisles and production equipment change the usable arrangement.
As of 10 August 2026, Wynn had not issued venue packages, prices or minimum spends. When sales begin, request a written capacity plan and a quote that covers production, catering, cancellation and accessibility rather than calculating attendance from the floor area alone.
The resort is on Al Marjan Island in Ras Al Khaimah, away from Dubai. Wynn's website puts Ras Al Khaimah International Airport at about 15 minutes by car, while a 2025 Wynn financing release estimated roughly 50 minutes from Dubai International Airport.
| Origin or route | What official sources say | Planning choice |
|---|---|---|
| Ras Al Khaimah International Airport | The resort website estimates about 15 minutes by car | Recheck the journey on arrival day because traffic changes |
| Dubai International Airport | Wynn's 2025 release says about 50 minutes and less than 50 miles | Allow for bags and congestion instead of treating the estimate as guaranteed |
| Wynn Bridge | A planned Wynn Boulevard connection to E311 and E611 | Late 2026 was the target, so verify that the route is open |
| Resort shuttle | No timetable or fare has been published | Do not build the trip around a service not announced by the operator |
| Parking and valet | Operating arrangements are still unpublished | Review arrival instructions when reservations open |
The 548-metre bridge is intended to give the resort a more direct connection to the wider road network, but the latest detailed release still treated it as a construction project. Wait for a Wynn completion notice or confirmation from a current mapping service before assuming it is open.
Confirm the final drop-off location after bookings begin because the hotel, events centre and marina may have separate entrances. Keep extra time in the itinerary, and do not pay for a transfer that is missing from a written reservation confirmation.
The GCGRA licensee register places Island 3 AMI FZ-LLC, trading as Wynn Al Marjan, in the land-based gaming facilities category. On 4 October 2024, Wynn announced that this project entity had received the UAE's first commercial gaming facility operator licence.
The register confirms that the named entity holds a GCGRA licence for this particular land-based facility. It lists The Game LLC separately as the UAE Lottery operator, so land-based facilities and lottery products use different licence categories. Once open, Wynn Al Marjan is positioned to become the first licensed casino in the Gulf Cooperation Council. The wider regulatory context is covered on our UAE gambling laws page.
Before guests enter, Wynn must publish the gaming floor's final age, identity, admission, responsible gaming and complaints arrangements. Rules issued for other Wynn properties do not apply here until this facility publishes its own terms.
Resort operations can change during the months before opening, so unknowns deserve the same attention as confirmed figures. The table prevents an email sign-up, design image or third-party offer from being read as a booking or a promise from the operator.
| Information | Position on 10 August 2026 | Practical response |
|---|---|---|
| Hotel reservations and room rates | No booking date or prices announced | Subscribe to official updates and wait for Wynn's booking engine |
| Restaurant reservations | Still closed on Wynn's dining page | Do not pay an intermediary for an unverified table |
| Casino game catalogue | Table, machine and title totals unpublished | Wait for the operator's gaming information |
| Betting limits | Minimum and maximum stakes remain unpublished | Do not use limits from Wynn Las Vegas as a substitute |
| Age, identification and admission charges | Wynn's final conditions are not published | Check Wynn and GCGRA before the journey |
| Dress code and opening hours | No information has been published | Read the guest guide when it is issued |
| Shuttle, parking and valet | No operating timetable or prices published | Ask for confirmation with the hotel reservation |
| Theatre tickets | Interest registration is live, but schedule and prices are incomplete | Keep registration separate from a ticket |
Wynn's pages collect email addresses and interests for news and early updates. This does not reserve a room, restaurant table or theatre seat, and it fixes neither price nor priority unless a separate booking confirmation arrives.
Begin with the resort website, match the licence to the GCGRA register, then compare the opening date with Wynn's newest investor release. When an official channel does not mention a detail, record it as unannounced rather than borrowing another resort's policy.
This page and its gaming content are for adults aged 18 and over. GCGRA advertising standards define anyone below 21 as underage for commercial gaming other than lottery. Wynn had not issued its final gaming-floor identity and admission policy by this update, so verify it before travelling and do not assume hotel access covers every resort area.
For a future one-day entertainment plan, use 800 United Arab Emirates dirhams (AED) as a teaching example, not as a Wynn price. Allocate AED 500 to transport, food and contingency, then set AED 300 as the fixed gaming ceiling whatever the result.
Choose the spending limit and end time before entering the gaming area, and keep extra cards or funds out of the plan. Once either limit is reached, leave instead of moving contingency money into another stake or chasing a loss.
Stop when gaming leads to concealed spending, borrowing, anxiety, or neglect of work and relationships. Our responsible gambling guide explains warning signs, a stopping plan and ways to seek support.
The answers below use official information available on 10 August 2026. Recheck the opening date and entry conditions when reservations begin because future operating details may change.
Not yet. Construction is still under way, and Wynn said on 4 August 2026 that the resort is planned to welcome guests in September 2027.
September 2027 is the current official target. Wynn gave that month in its second quarter results on 4 August 2026, replacing earlier guidance for the first quarter or spring 2027.
The resort is on Al Marjan Island in the emirate of Ras Al Khaimah, not Dubai. Wynn's site estimates about 15 minutes by car from Ras Al Khaimah International Airport.
Wynn's latest annual filing gives 225,000 sq ft, or about 20,900 sqm. Older project coverage used an approximate 18,500 sqm figure, so this guide follows the newer company filing.
The announced total is 1,530 accommodation units. It contains 1,217 Resort rooms, 297 Enclave suites, two Royal Apartments, four Garden Townhomes and 10 Marina Estates.
The General Commercial Gaming Regulatory Authority, GCGRA, granted the licence to Island 3 AMI FZ-LLC, trading as Wynn Al Marjan. Wynn announced receipt of the UAE's first commercial gaming facility operator licence on 4 October 2024.
By 10 August 2026, Wynn had not announced a date for hotel reservations, and its dining page still showed restaurant bookings as closed. Joining the email list does not create a booking or guarantee a rate or priority.
As of 10 August 2026, Wynn had not released a table game list, slot count or betting limits. Wait for the operator's gaming information and entry terms instead of taking details from another Wynn resort.
The resort website estimates about 15 minutes by car from Ras Al Khaimah International Airport, while a Wynn release previously put the drive from Dubai International Airport at about 50 minutes. Traffic affects both estimates, and the February 2026 update still described Wynn Bridge as under construction.
GCGRA advertising standards classify anyone under 21 as underage for commercial gaming other than lottery. Wynn had not published final gaming-floor identification and admission rules by 10 August 2026, so visitors should check Wynn and GCGRA terms before travelling.